FREQUENTLY ASKED QUESTIONS (FAQ's)

The Eglinton West LRT Project is important because it will close the gap in our existing transit network, continuing LRT services beyond Mt. Dennis and providing a connection to Pearson International Airport, provide added transportation accessibility and give people the choice on how they move around the City. This means more travel connections for local and area residents, better access to area businesses and jobs, and shorter transit commutes.  
  • The LRT will help:
  • - Serve population and employment growth
  • - Provide sustainable transportation choices that meet the needs of continued growth
  • - Meet our city-building objectives:
    • - Shape our evolving neighbourhoods
    • - Create connected spaces and invest in social and physical services and infrastructure, which are fundamental to the city’s quality of life
    • - Develop an attractive and safe city that evokes pride, passion and a sense of belonging
Once completed a transit rider will be able to travel to:
  • - Mount Dennis in the east, where they could continue to midtown Toronto on the Eglinton Crosstown (Line 5), or transfer to the SmartTrack Station to access downtown and eastern parts of Toronto.
  • - To the Mississauga Corporate Centre at Renforth Station (Commerce Boulevard) in the west, where they could continue to the Mississauga City Centre on the recently completed Mississauga Transitway.
  • - The future Regional Transit Centre (RTC) – at Pearson International Airport.
Transit riders will also be able to make quick connections to several busy north-south express and local bus routes.
Light Rail Transit (LRT) provides reliable, quiet, energy efficient, and accessible public transit that meets the demand projections for the corridor.

Fully grade-separated rapid transit (subway or elevated rail) comes with substantially higher cost (from two to three times as costly as a surface LRT) and greater short and long term impacts on the community.

Full grade separation was last considered for the corridor in the 2016 Initial Business Case (IBC). The IBC concluded that a fully grade-separated option:
  • a) has negative community impacts;
  • b) has significantly higher costs than at-grade option; and
  • c) does not meet local access objectives, requiring continuation of the existing local bus services.
As a result, City Council directed staff to review targeted grade separations and remove from further consideration a fully grade separated option.
Bus Rapid Transit (BRT) requires unfavourable transfer locations, and offers nominal ridership attraction. Key considerations were how Eglinton West transit would connect to the Mississauga BRT and whether the transfer between LRT and BRT should occur at Renforth Gateway in the west, or at Jane/Mt. Dennis in the east. In contrast Light Rapid Transit (LRT) offers premium service with a significantly better passenger experience, the ability to attract economic growth, more reliable and higher capacity ridership than BRT, and more favourable transfer locations.
  • Left – LRT serves key destinations, Renforth and the Airport
  • Right – Many customers would have to transfer at Mt. Dennis to reach destinations
There is enough space to implement the LRT that was approved in 2010. Any changes to the design, including potential grade separations or additional turning lanes for traffic, may mean that additional land needs to be acquired.
The LRT that was approved in 2010 would run along the centre of Eglinton Avenue, at the surface. Two lanes of traffic - the same as exist today - would be maintained in each direction. Details like the configuration of turning lanes have not yet been determined. LRT offers a premium passenger experience with improved comfort, reliability and attractive design. LRT vehicles will offer a much higher capacity than buses, will operate more quickly due to less frequent stopping and have a dedicated right-of-way with signal priority at intersections. LRT platforms will:
  • - Be accessible to mobility devices at every stop
  • - Will be illuminated at night Include ticket vending machines
LRT will have minimal impact on traffic, since it would travel on its own right-of-way and will not reduce the number of traffic lanes. Impacts are expected to be restricted to the time it would take for cars and trucks to turn left.
LRT produces about the same or less noise as general suburban traffic, about 60 dBa and produces near-zero emissions meaning low impact on air quality and making it the right choice for the environment.  
The funds for preliminary design and engineering for the Toronto portion of this Project were approved by Toronto City Council in November 2016. City Council has also agreed in principle to fund the capital construction costs for the Toronto portion of this Project, subject to several conditions including confirmation of funding for the airport connection from other parties.
As service at Pearson International Airport grows – by 2040, 110 million passengers are expected to be transported each year – the Eglinton West LRT will provide much-needed access for employees and travellers alike.