Eglinton West LRT Design Options

As directed by Council in December 2017, further design options for the Eglinton West LRT were developed in consultation with the Community Working Group (CWG). An Options Analysis was then conducted using four design options for the Eglinton West LRT:

Option #1

Surface-running LRT,
with 10 stops on
Eglinton Ave W.

Option #2

Underground LRT,
with 10 stops on
Eglinton Ave W.

Option #3

Combination elevated and
underground LRT, with
three (3) stops on
Eglinton Ave W.

Option #4

Combination elevated and
underground LRT, with seven
(7) stops on Eglinton Ave W.
(as recommended by the CWG in 2018)

Metrolinx continues to refine the alignment of the Airport Segment, from Renforth Station to the Airport, and evaluate additional regional benefits.